- March 13, 2023
- Posted by: kqreative
- Category: Press Releases
ATLANTA, Ga – March 13, 2023 – GTABS Inc. successfully completed the track cut-in process at Brightline Aventura station in Miami, FL. GTABS’ cut-in work now allows train traffic to flow on both sides of the track (east and west) in and out of Aventura station.
Per GTABS’ CEO, Jerome Hall, “we are excited to successfully complete the Aventura station cut-in project as this doubles passenger access because riders can now load from both the east and west simultaneously.”
The direct benefits of GTABS executing this project include increased passenger satisfaction due to easier entry access and the ability to now travel east and west.
The opportunity for higher profits for Brightline is evident based on doubling passengers’ options to travel on the high speed rail either east or west.